The building is being delivered to Cat A specification in the Summer 2021, to include –
• Dedicated entrance/reception
• Two passenger lifts serving all floors
• Male & Female super WC’s to each floor
• 4 Pipe F/C Air conditioning
• Plaster soffit ceilings
• Full access raised floors
• Predominantly full height glazing